事業計画:波力発電の採算(2.5m)

□FOR 2.5m WAVE HEIGHT
1ページ/1ページ

****************************************
* POWER GENERATION ANALYSIS
****************************************
 The optimization calculation example for 2.5m wave height is shown. This is an example of
optimization calculation, and not a correct answer. This calculation is not easy. The
weight of the 2.5m power generation buoy is much different from 1.5m wave. When the power
generation buoy for 2.5m is used for 1.5m, the power generation efficiency becomes
inferior.

A. Analysis of movement at 2500mm wave height, variable torque load with freeing the load
 at the top dead center.
B. Calculation of work and work rate at 2500mm wave height, torque load (6050kgf) with
 freeing the load at the top dead center
1. Work by buoyancy
(A) The torque load is 6050kgf, and the distance is 872.4mm (Hmb).
(B) The work by buoyancy: Wb= 6050(kgf)*(872.4/1000)(m)= 5278.0 (kgf*m)
2. Work by gravity
(A) The torque load is 6776kgf, and the distance is 2500mm (Hmg).
(B) The work by gravity: Wg= 6776(kgf)*(2500/1000)(m)= 16940.0(kgf*m)
3. Total Work; Wt= 5278.0(kgf*m) + 16940.0(kgf*m)= 22218.0(kgf*m)
4. Work rate
(A) The work rate is obtained by dividing the total work by the cycle of wave.
(B) Total work is 22218.0(kgf*m), and the cycle of the wave is 7.30sec (t0).
(C) Total work rate: Wr= 22218.0(kgf*m)/7.30(sec)= 3043.6(kgf*m/sec)
(D) 1(kgf*m/sec)= 9.81(W)= 0.00981(kW), Wr= 3043.6*0.00981(kW)= 29.9(kW)
*
要約すると・・・。
1.(当たり前だが)波高2.5mの発電能力は波高1.5mに優るが、その最適化計算はとても
 難しい。波高1.5mと発電ファームの外観は同じでも、発電ブイの重量や強度および制御プロ
 グラムは全く異なる。
2.理想的な波高2.5mの発電能力は29.9kWと計算される。波高1.5mは14.5kW
 であるから、約2倍である。
3.波力発電において、北極・南極および赤道付近の強風地帯は有利である。しかしながら、両極
 地方および赤道ベルト地帯は低開発国であることが多い。これから国内に送電線を張り巡らせる
 ためには、大量の「銅」資源が要る。
4.しかし残念ながら・・・。その需要を賄うだけの資源は、この地球に存在しないのではないか
 と危惧される。従って我々は、送電線に代わる「新しい送電システム」を造り出さなくてはなら
 ない。それが「水素タンク」である。
*